As of this December 2020, ATS’s Solar Power Plant Control & Monitoring Solution has been successfully implemented in solar projects of various scale in Vietnam, which include super-sized projects such as Loc Ninh 1-2-3 Solar Power Plants (550MWp) and Phu My 1-2-3 Solar Power Plants (330MWp). As of date, ATS’s solar power plant control system accounts for 22% of Vietnam’s solar market share (excluding rooftop PV).
Loc Ninh 1-2-3 Solar Power Plants (550MWp)
- Project Owner: Super Energy Group
- EPC Contractor: Power China
- Date of commissioning and COD: December 2020
ATS scope for the project covers the supply of substation automation system for a 220kV substation, a comprehensive PV SCADA, PPC and generation forecast system for 03 power plants, an operational control center (OCC) with relevant approval by authorities, and all relevant services required for COD-related procedures and operations. The project has been completed successfully within a tight timeline.
Phu My 1-2-3 Solar Power Plants (330MWp)
- Project Owner: Bamboo Capital Group
- EPC Contractor: Power China
- Date of commissioning and COD: December 2020
ATS scope for the project covers a comprehensive PV SCADA, PPC and generation forecast system together with an operational control center (OCC) for 03 power plants. The project has been completed successfully within a tight timeline.
With ATS’s system, the above power plants have been in steady and reliable operation since commissioning, maintaining a high level of performance while still allows for ease of operation and maintenance.