<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>#ATSJSC #LeadingInnovation #SmartTechnology #ATS_Project Archives - ATS JSC</title>
	<atom:link href="https://ats.com.vn/tag/atsjsc-leadinginnovation-smarttechnology-ats_project/feed/" rel="self" type="application/rss+xml" />
	<link>https://ats.com.vn/tag/atsjsc-leadinginnovation-smarttechnology-ats_project/</link>
	<description>Applied Technical Systems Joint Stock Company</description>
	<lastBuildDate>Mon, 30 Oct 2023 02:37:52 +0000</lastBuildDate>
	<language>ENH</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>
	<item>
		<title>ATS’s Showcase at All-Energy Australia 2023: Connection for a Sustainable Future</title>
		<link>https://ats.com.vn/atss-showcase-at-all-energy-australia-2023-connection-for-a-sustainable-future/</link>
		
		<dc:creator><![CDATA[trangth]]></dc:creator>
		<pubDate>Thu, 26 Oct 2023 02:25:23 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[#ATS_Exhibitions]]></category>
		<category><![CDATA[#ATSJSC #LeadingInnovation #SmartTechnology #ATS_Project]]></category>
		<category><![CDATA[#SustainableFuture]]></category>
		<guid isPermaLink="false">https://ats.com.vn/?p=9733</guid>

					<description><![CDATA[<p>This 25-26 October, ATS, in collaboration with AusRE Solutions Pty Ltd, has demostrated our demonstrate our cutting-edge energy transition products and services at All-Energy Australia 2023 in Melbourne, Australia. With over 350 major suppliers and over 10,000 industry experts in attendance and as Australia’s largest and most eagerly anticipated clean energy event, All-Energy Australia provided [&#8230;]</p>
<p>The post <a href="https://ats.com.vn/atss-showcase-at-all-energy-australia-2023-connection-for-a-sustainable-future/">ATS’s Showcase at All-Energy Australia 2023: Connection for a Sustainable Future</a> appeared first on <a href="https://ats.com.vn">ATS JSC</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>This 25-26 October, ATS, in collaboration with AusRE Solutions Pty Ltd, has demostrated our demonstrate our cutting-edge energy transition products and services at <a href="https://www.all-energy.com.au/en-gb.html">All-Energy Australia 2023</a> in Melbourne, Australia. With over 350 major suppliers and over 10,000 industry experts in attendance and as Australia’s largest and most eagerly anticipated clean energy event, All-Energy Australia provided a platform for industry leaders, experts, and enthusiasts to explore the latest innovations and advancements in the clean energy sector.</p>
<p>During the course of the event, clients and partners have been introduced with product real-time demonstration to our range of integrated and comprehensive solutions for the control, monitoring and management of renewable power systems (solar and wind), which have been successfully deployed in over 3+ GW of projects:</p>
<ul>
<li>Hybrid Renewable Energy Solution</li>
<li><a href="https://ats.com.vn/wind-plant-control-monitoring/">Wind</a> and <a href="https://ats.com.vn/solar-plant-control-monitoring/">Solar</a> Plant Control &amp; Monitoring Solution (PV SCADA &amp; PPC)</li>
<li>Distributed Energy Resource Management (<a href="https://ats.com.vn/derms/">DERM</a>) Solution for Rooftop Solar</li>
<li>Centralized Operation Control Systems (<a href="https://ats.com.vn/operation-control-centre/">OCC</a>) for clusters of power plants over wide geographical area</li>
<li>Integrated Control, Protection and Automation System for Substation (<a href="https://ats.com.vn/substation-automation/">SAS</a>)</li>
</ul>
<p>Our presence at All-Energy Australia 2023 reflected our unwavering commitment to a sustainable future. With our innovative products and solutions, we aim to take an active role in driving forwards the transition to clean energy worldwide.</p>
<p><img fetchpriority="high" decoding="async" class="alignnone size-full wp-image-9729" src="https://ats.com.vn/medias/medias/2023/10/A1x.jpg" alt="" width="1244" height="700" /></p>
<p><img decoding="async" class="alignnone size-full wp-image-9730" src="https://ats.com.vn/medias/medias/2023/10/A2.jpeg" alt="" width="1242" height="710" /></p>
<p><img decoding="async" class="alignnone size-full wp-image-9717" src="https://ats.com.vn/medias/medias/2023/10/1x.png" alt="" width="881" height="659" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-9718" src="https://ats.com.vn/medias/medias/2023/10/2x.png" alt="" width="881" height="658" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-9720" src="https://ats.com.vn/medias/medias/2023/10/4x.png" alt="" width="881" height="659" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-9722" src="https://ats.com.vn/medias/medias/2023/10/6x.png" alt="" width="881" height="658" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-9721" src="https://ats.com.vn/medias/medias/2023/10/5x.png" alt="" width="881" height="659" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-9724" src="https://ats.com.vn/medias/medias/2023/10/8x.png" alt="" width="881" height="659" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-9725" src="https://ats.com.vn/medias/medias/2023/10/9x.png" alt="" width="881" height="659" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-9726" src="https://ats.com.vn/medias/medias/2023/10/10x.png" alt="" width="881" height="659" /></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-9727" src="https://ats.com.vn/medias/medias/2023/10/11x.png" alt="" width="881" height="659" /></p>
<hr />
<p>ATS Solutions Video Gallery: <a href="https://youtube.com/playlist?list=PL2C9F77AE23BB603F">https://youtube.com/playlist?list=PL2C9F77AE23BB603F</a></p>
<p>The post <a href="https://ats.com.vn/atss-showcase-at-all-energy-australia-2023-connection-for-a-sustainable-future/">ATS’s Showcase at All-Energy Australia 2023: Connection for a Sustainable Future</a> appeared first on <a href="https://ats.com.vn">ATS JSC</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Successful Energization of 500kV Lao Cai Substation and 220kV Connecting Lines</title>
		<link>https://ats.com.vn/successful-energization-of-500kv-lao-cai-substation-and-220kv-connecting-lines/</link>
		
		<dc:creator><![CDATA[trangth]]></dc:creator>
		<pubDate>Mon, 09 Oct 2023 03:12:59 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[#ATSJSC #LeadingInnovation #SmartTechnology #ATS_Project]]></category>
		<guid isPermaLink="false">https://ats.com.vn/?p=9683</guid>

					<description><![CDATA[<p>Source: MOIT Last 6 August, Power Transmission Company No.1 (PTC1), in collaboration with related authorities and contractors, has successfully completed the energization of 550kV Lao Cai Substation and connecting lines. A critical national power infrastructure, the VND 1,500BN project spans an area of 178,350 m2 in Lao Cai province. The scope of this project covers [&#8230;]</p>
<p>The post <a href="https://ats.com.vn/successful-energization-of-500kv-lao-cai-substation-and-220kv-connecting-lines/">Successful Energization of 500kV Lao Cai Substation and 220kV Connecting Lines</a> appeared first on <a href="https://ats.com.vn">ATS JSC</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Source: <a href="https://congthuong.vn/dong-dien-tram-bien-ap-500kv-lao-cai-va-cac-duong-day-220kv-dau-noi-276803.html">MOIT</a></p>
<p>Last 6 August, Power Transmission Company No.1 (PTC1), in collaboration with related authorities and contractors, has successfully completed the energization of 550kV Lao Cai Substation and connecting lines.</p>
<p>A critical national power infrastructure, the VND 1,500BN project spans an area of 178,350 m2 in Lao Cai province. The scope of this project covers the construction and installation of a new 500/220/35kV substation with capacity of 2 x 900MVA (of which 01 transformer is installed in phase 1) as well as connecting lines to 220kV Bao Thang – Yen Bai.</p>
<p>The integrated protection &amp; control system of 500kV Lao Cai substation applies ATS’s Substation Automation Solution @Station®, with ATS being responsible for providing the completed secondary system, communication &amp; SCADA and services related techniques for the said project.</p>
<p>Once in operation, the new 500kV substation is expected to play a major role in ensuring power stability for Lao Cai province as well as improving connection of the regional power systems to the national power grid, improving operation reliability, stability and security for the national power system.</p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-9702" src="https://ats.com.vn/medias/medias/2023/10/A1.jpg" alt="" width="1000" height="563" /></p>
<p>Overview of 500kV Lao Cai Substation site (Source: EVN)</p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-9697" src="https://ats.com.vn/medias/medias/2023/10/2.png" alt="" width="1175" height="780" /></p>
<p>500kV Lao Cai Substation swithyard</p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-9695" src="https://ats.com.vn/medias/medias/2023/10/3.png" alt="" width="1175" height="779" /></p>
<p>500kV Lao Cai Substation control room</p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-9696" src="https://ats.com.vn/medias/medias/2023/10/4.png" alt="" width="1175" height="780" /></p>
<p>SEL IEDs-integrated control &amp; protection panel system supplied by ATS</p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-9700" src="https://ats.com.vn/medias/medias/2023/10/5.png" alt="" width="1175" height="780" /></p>
<p>Testing and commissioning of 500kV substation control &amp; protection system</p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-9699" src="https://ats.com.vn/medias/medias/2023/10/6.png" alt="" width="1175" height="781" /></p>
<p>500kV substation control &amp; protection system in operation</p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-9698" src="https://ats.com.vn/medias/medias/2023/10/1.png" alt="" width="1175" height="781" /></p>
<p>ATS Engineers at 500kV Lao Cai Substation site</p>
<p>The post <a href="https://ats.com.vn/successful-energization-of-500kv-lao-cai-substation-and-220kv-connecting-lines/">Successful Energization of 500kV Lao Cai Substation and 220kV Connecting Lines</a> appeared first on <a href="https://ats.com.vn">ATS JSC</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>BNF Technology – ATS JSC Partnership</title>
		<link>https://ats.com.vn/bnf-technology-ats-jsc-partnership/</link>
		
		<dc:creator><![CDATA[trangth]]></dc:creator>
		<pubDate>Mon, 11 Sep 2023 03:00:15 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[#ATSJSC #LeadingInnovation #SmartTechnology #ATS_Project]]></category>
		<guid isPermaLink="false">https://ats.com.vn/?p=9639</guid>

					<description><![CDATA[<p>Source: HanAra Software BNF Technology, HanAra Software’s parent company and industrial software solution provider, has entered a valuable partnership with ATS. ATS is a provider of integration systems for substation automation and power system control. The two companies have a shared commitment to deliver cutting-edge technology and service. Their partnership aims to provide improved data [&#8230;]</p>
<p>The post <a href="https://ats.com.vn/bnf-technology-ats-jsc-partnership/">BNF Technology – ATS JSC Partnership</a> appeared first on <a href="https://ats.com.vn">ATS JSC</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="row">
<div class="col-10">
<p style="text-align: left;"><img loading="lazy" decoding="async" class="alignnone size-full wp-image-9641" src="https://ats.com.vn/medias/medias/2023/08/CanvaATS_2023.png" alt="" width="2048" height="1070" />Source: <a href="https://www.hanarasoft.com/ats/">HanAra Software</a></p>
</div>
</div>
<p><a href="http://www.bnftech.com/"><span data-contrast="none">BNF Technology</span></a><span data-contrast="auto">, HanAra Software’s parent company and industrial software solution provider, has entered a valuable partnership with ATS. ATS is a provider of integration systems for substation automation and power system control. The two companies have a shared commitment to deliver cutting-edge technology and service. Their partnership aims to provide improved data management and predictive maintenance solutions to the Vietnamese power market.</span></p>
<p><span data-contrast="auto">The partnership will bolster local insight and industry support of digital transformation initiatives. With ATS’s substation automation and power engineering experience, the Vietnamese power industry will leverage proven and advanced operational technology. Additionally, with <a href="https://www.hanarasoft.com/products/hanprism/">HanPrism</a>®, organizations will have a centralized location to analyze and visualize equipment insights. Furthermore, with <a href="https://www.hanarasoft.com/products/hanphi/">HanPHI</a>®, individual sites and fleets will improve overall system reliability by identifying potential failures in advance. Lastly, the combined forces of BNF-HanAra and ATS will significantly contribute to Vietnam’s energy infrastructure through enhanced access to data-driven insights. </span></p>
<p><span data-contrast="auto">Upon announcing the partnership at the BNF-HanAra Quarterly Review, Kookjong Hwang, BNF Director-Solution Business, stated, “By partnering and collaborating with engineering experts like ATS, we will be better able to support the power industry achieve operational excellence. With ATS’s years of experience and industrial support, power organizations will better integrate and operationalize the actionable intelligence created by our data management and machine learning solutions in their day-to-day.” </span></p>
<h2>About BNF Technology<span data-ccp-props="{"> </span>and HanAra Software</h2>
<p><span data-contrast="auto">BNF Technology and its global subsidiary HanAra Software connect industry knowledge with innovative technology to provide integrated data management and predictive maintenance solutions for the process industry. Through the implementation of HanAra solutions, organizations enjoy results including reduced costs, increased efficiencies, and ultimately improved safety. HanAra Software combines solutions with training and care programs to support customers every step of the way.</span></p>
<p>Headquartered in South Korea with offices in the United States and India, BNF Technology is a professional software development company that provides optimized software solutions for the operational management of the process industry. Since 2000, BNF Technology has provided various solutions to more than 300 units across two continents to help them on their digital transformation journey as they achieve operational excellence.</p>
<h2>About ATS</h2>
<p><a href="https://ats.com.vn/company-overview/"><span data-contrast="none">ATS</span></a><span data-contrast="auto"> is a leader in Vietnam’s substation automation and power system control. Their goal is to deliver integrated solutions that provide high customer satisfaction and cultivate continuous employee growth. ATS are architects of smart solutions, architects of the future. ATS’s innovative approach powers comprehensive power system control, protection, and management solutions from concept to realization. Furthermore, ATS’s spectrum encompasses engineering, procurement, construction, installation, commissioning, and long-term O&amp;M services for Grid Stations and power plant projects.</span><span data-ccp-props="{"> </span></p>
<p><span data-contrast="auto">With a legacy of excellence dating back to 1998, ATS has established itself as a trusted partner in the Vietnamese power sector. In addition, ATS has successfully delivered 110kV-220kV-500kV Substation Automation System (SAS) and Distribution Control System (DCS) projects. Moreover, they have cornered nearly 40% of the Vietnam Transmission Grid market. ATS is a hub of industry insights and networking. Lastly, the dedicated ATS team of over 100 experts collaborates seamlessly to ensure projects are delivered on time and with utmost reliability.</span></p>
<p>The post <a href="https://ats.com.vn/bnf-technology-ats-jsc-partnership/">BNF Technology – ATS JSC Partnership</a> appeared first on <a href="https://ats.com.vn">ATS JSC</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>[Project Showcase] Loc Ninh 1-2-3 Solar Power Plants (550MWp)</title>
		<link>https://ats.com.vn/project-showcase-loc-ninh-1-2-3-solar-power-plants-550mwp/</link>
		
		<dc:creator><![CDATA[AdminAts]]></dc:creator>
		<pubDate>Mon, 03 Oct 2022 03:54:36 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[#ATSJSC #LeadingInnovation #SmartTechnology #ATS_Project]]></category>
		<category><![CDATA[#ATSJSC_Projects]]></category>
		<guid isPermaLink="false">https://ats.com.vn/vi/?p=9110</guid>

					<description><![CDATA[<p>As one of the largest renewable energy projects in ASEAN region to date, Loc Ninh 1-2-3 Solar Plants, managed by Super Energy Corporation (Thailand), cover an area of over 660 hectares. With a total capacity of 550MWp, the plants can supply up to 881,668 MWh annually to Vietnam’s national power grid. To optimize the operation [&#8230;]</p>
<p>The post <a href="https://ats.com.vn/project-showcase-loc-ninh-1-2-3-solar-power-plants-550mwp/">[Project Showcase] Loc Ninh 1-2-3 Solar Power Plants (550MWp)</a> appeared first on <a href="https://ats.com.vn">ATS JSC</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>As one of the largest renewable energy projects in ASEAN region to date, Loc Ninh 1-2-3 Solar Plants, managed by Super Energy Corporation (Thailand), cover an area of over 660 hectares. With a total capacity of 550MWp, the plants can supply up to 881,668 MWh annually to Vietnam’s national power grid.</p>
<ul>
<li>To optimize the operation efficiency and reliability of such a large-scale project, Loc Ninh 1-2-3 Power Plants apply ATS’s comprehensive solutions for the monitoring, control, and protection for the entire facility, including:<br />
Substation Automation System @Station®</li>
<li>Solar Power Plant Control &amp; Monitoring and Generation Forecast (PV SCADA &amp; PPC)</li>
<li>Centralized Operations Control Centre @OCC™</li>
</ul>
<p>ATS’s scope for the project covered an end-to-end package from design, supply, installation, testing, training to relevant services required for COD-related procedures and operations, all completed within a tight timeline.</p>
<p>&nbsp;</p>
<p><iframe loading="lazy" title="ATS at Loc Ninh 1-2-3 Solar Power Plants (550MWp): an Overview" width="640" height="360" src="https://www.youtube.com/embed/048Nm-dK5bk?feature=oembed" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" referrerpolicy="strict-origin-when-cross-origin" allowfullscreen></iframe></p>
<p>The post <a href="https://ats.com.vn/project-showcase-loc-ninh-1-2-3-solar-power-plants-550mwp/">[Project Showcase] Loc Ninh 1-2-3 Solar Power Plants (550MWp)</a> appeared first on <a href="https://ats.com.vn">ATS JSC</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Successful Energization of 500kV Quang Trach – Doc Soi Transmission Line</title>
		<link>https://ats.com.vn/successful-energization-of-500kv-quang-trach-doc-soi-transmission-line/</link>
		
		<dc:creator><![CDATA[trangth]]></dc:creator>
		<pubDate>Thu, 02 Jun 2022 03:02:34 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[#ATSJSC #LeadingInnovation #SmartTechnology #ATS_Project]]></category>
		<guid isPermaLink="false">https://ats.com.vn/?p=8847</guid>

					<description><![CDATA[<p>At 19:19 on 31 May 2022, the 500kV Quang Trach – Doc Soi Transmission Line and 500kV Quang Trach Power Center Switch Yard Project was successfully energized under the supervision of the National Power Transmission Corporation and the Central Power Project Management Board in collaboration with other authorities and contractors. Once in operation, the 500kV [&#8230;]</p>
<p>The post <a href="https://ats.com.vn/successful-energization-of-500kv-quang-trach-doc-soi-transmission-line/">Successful Energization of 500kV Quang Trach – Doc Soi Transmission Line</a> appeared first on <a href="https://ats.com.vn">ATS JSC</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>At 19:19 on 31 May 2022, the <strong>500kV Quang Trach – Doc Soi Transmission Line and 500kV Quang Trach Power Center Switch Yard Project </strong>was successfully energized under the supervision of the National Power Transmission Corporation and the Central Power Project Management Board in collaboration with other authorities and contractors. Once in operation, the 500kV Quang Trach – Doc Soi Transmission Line will contribute to enhancing Vietnam power system’s 500kV transmission line capacity, facilitating renewable energy generation within the area, as well as ensuring electricity supply for social and economical activities of the Southern area and surrounding provinces including Quang Binh, Quang Tri, Thua Thien Hue, Quang Nam, Quang Ngai and Da Nang city.</p>
<p>Honored to be a contractor for this national critical project, ATS’s scope covered the comprehensive range of design, supply, installation, testing and commissioning of a comprehensive substation control &amp; protection system for the 500kV Substation (<a href="https://ats.com.vn/substation-automation/">@Station®</a>)</p>
<p><iframe loading="lazy" title="ĐÓNG ĐIỆN ĐƯỜNG DÂY 500KV QUẢNG TRẠCH – DỐC SỎI VÀ SÂN PHÂN PHỐI 500 KV QUẢNG TRẠCH" width="640" height="360" src="https://www.youtube.com/embed/8bCenV5_LGc?feature=oembed" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" referrerpolicy="strict-origin-when-cross-origin" allowfullscreen></iframe></p>
<p>&nbsp;</p>
<p>The post <a href="https://ats.com.vn/successful-energization-of-500kv-quang-trach-doc-soi-transmission-line/">Successful Energization of 500kV Quang Trach – Doc Soi Transmission Line</a> appeared first on <a href="https://ats.com.vn">ATS JSC</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>500kV Phu Lam Integrated Substation Successfully Commenced Operation</title>
		<link>https://ats.com.vn/500kv-phu-lam-integrated-substation-successfully-commenced-operation/</link>
		
		<dc:creator><![CDATA[trangth]]></dc:creator>
		<pubDate>Wed, 09 Feb 2022 09:50:42 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[#ATSJSC #LeadingInnovation #SmartTechnology #ATS_Project]]></category>
		<guid isPermaLink="false">https://ats.com.vn/?p=8430</guid>

					<description><![CDATA[<p>At 20:00 on 26 Jan 2022, in collaboration with the Southern Power Project Management Board, Power Transmission Company No. 4 and other related parties, ATS completed energization works on 500kV Phu Lam Substation (Ho Chi Minh City), bringing the integrated substation into official operation. 500kV Phu Lam is the first to be completed with an [&#8230;]</p>
<p>The post <a href="https://ats.com.vn/500kv-phu-lam-integrated-substation-successfully-commenced-operation/">500kV Phu Lam Integrated Substation Successfully Commenced Operation</a> appeared first on <a href="https://ats.com.vn">ATS JSC</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>At 20:00 on 26 Jan 2022, in collaboration with the Southern Power Project Management Board, Power Transmission Company No. 4 and other related parties, ATS completed energization works on 500kV Phu Lam Substation (Ho Chi Minh City), bringing the integrated substation into official operation.</p>
<p>500kV Phu Lam is the first to be completed with an upgraded control system amongst the group of substations under sub-project “Upgrading protection and control systems of 500kV and 220kV in Southern Region of Vietnam”, a component of the Transmission Efficiency Project invested by the National Power Transmission Corporation (EVNNPT) and funded by World Bank. This is one of Vietnam’s large-scaled power transmission project with total investment amount of $897 million USD, the aim of which is to improve the operational efficiency of 220kV and 500kV substations under EVNNPT through the deployment of computerized integrated control system for critical substations, in accordance with Vietnam’s Smart Grids-oriented development roadmap for power system.</p>
<p>As one of the substations identified for upgrade, 500kV Phu Lam is a project of large scale covering: six 500kV bays, two 900MVA/500KV transformers; fourteen 220kV bays, three 250MVA/220KV transformers; nineteen 110kV bays, two 63MVA/110KV transformers; and nineteen 22kV bays. In addition, 500kV Phu Lam Substation is also a key point on the national 500kV Ultra-High Voltage Transmission Line, responsible for ensuring a safe and uninterrupted energy supply serving the nation’s economic and social activities. This therefore further adds to the complexity of the project.</p>
<p>With extensive experience in implementing critical projects, ATS was appointed to modernize 500kV Phu Lam Substation, transforming the substation from one with a traditional control system into one integrated and automated in accordance with international standard IEC61850. ATS’s @Station® has been applied for the substation control system to enhance its operation flexibility, efficiency, reliability and safety, through the improvement of automated control, monitoring, and information exchange between transmission power units and dispatching centers.</p>
<p>Going into operation, 500kV Phu Lam Integrated Substation will contribute to the reliability and safety the national 500kV Ultra-High Voltage Transmission network, ensuring continuous power supply for Vietnam’s  economical and social operations. The project also marks an important milestone in Vietnam’s power system development towards Smart Grids, an important step towards the national digital transformation.</p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-8391" src="https://ats.com.vn/medias/medias/2022/01/Anh1_Hoan-thanh-He-thong-DKBV-Tich-Hop.jpg" alt="" width="1920" height="1152" /><em>ATS and EVNNPT celebrated the commencement of 500kV Phu Lam Integrated Substation operation</em></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-8392" src="https://ats.com.vn/medias/medias/2022/01/Slide2.jpg" alt="" width="1920" height="1152" /><em>ATS Engineer team at 500kV Phu Lam, completing its energization on evening of 26 Jan 2022</em></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-8393" src="https://ats.com.vn/medias/medias/2022/01/Slide3.jpg" alt="" width="1920" height="1152" /><em>Installation works performed around the clock at 500kV Phu Lam to meet with the tight deadline of a key project</em></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-8394" src="https://ats.com.vn/medias/medias/2022/01/Slide4.jpg" alt="" width="1920" height="1152" /><em>System testing performed around the clock to meet with project’s quality requirement</em></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-8395" src="https://ats.com.vn/medias/medias/2022/01/Slide5.jpg" alt="" width="1920" height="1152" /><em>System testing and commissioning with EVN</em></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-8396" src="https://ats.com.vn/medias/medias/2022/01/Slide6.jpg" alt="" width="1920" height="1152" /><em>500kV Phu Lam Substation’s control room after upgrade</em></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-8397" src="https://ats.com.vn/medias/medias/2022/01/Slide7.jpg" alt="" width="1920" height="1152" /><em>ATS’s Substation Automation System @Station® applied for 500kV Phu Lam Substation</em></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-8398" src="https://ats.com.vn/medias/medias/2022/01/Slide8.jpg" alt="" width="1920" height="1152" /><em>SEL digital protection relays integrated in ATS’s solution for substation control and monitoring </em></p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-8399" src="https://ats.com.vn/medias/medias/2022/01/Slide9.jpg" alt="" width="1920" height="1152" /><em>500kV Phu Lam Substation Switchyard – a key point on Vietnam’s 500kV Ultra-High Voltage Transmission Line</em></p>
<p>The post <a href="https://ats.com.vn/500kv-phu-lam-integrated-substation-successfully-commenced-operation/">500kV Phu Lam Integrated Substation Successfully Commenced Operation</a> appeared first on <a href="https://ats.com.vn">ATS JSC</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>ATS Awarded with Contract for 500kV Van Phong Substation Secondary System</title>
		<link>https://ats.com.vn/ats-awarded-with-contract-for-500kv-van-phong-substation-secondary-system/</link>
		
		<dc:creator><![CDATA[AdminAts]]></dc:creator>
		<pubDate>Fri, 14 Jan 2022 03:03:51 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[#ATSJSC #LeadingInnovation #SmartTechnology #ATS_Project]]></category>
		<guid isPermaLink="false">https://ats.com.vn/?p=8340</guid>

					<description><![CDATA[<p>The 500kV Van Phong Substation and Connection is a new project developed by EVNNPT (Electricity of Vietnam – National Power Transmission Corporation), located in Khanh Hoa province. The project is amongst the various critical developments scheduled in the Vietnam Power Development Master Plan, with the aim of ensuring a safe and reliable power supply for [&#8230;]</p>
<p>The post <a href="https://ats.com.vn/ats-awarded-with-contract-for-500kv-van-phong-substation-secondary-system/">ATS Awarded with Contract for 500kV Van Phong Substation Secondary System</a> appeared first on <a href="https://ats.com.vn">ATS JSC</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The 500kV Van Phong Substation and Connection is a new project developed by EVNNPT <em>(Electricity of Vietnam – National Power Transmission Corporation), </em>located in Khanh Hoa province. The project is amongst the various critical developments scheduled in the Vietnam Power Development Master Plan, with the aim of ensuring a safe and reliable power supply for Khanh Hoa and surrounding provinces, facilitating the socio-economic development of the key economic region of South Central Coast, in addition to undertaking part of the capacity of Van Phong 1 BOT power plant and other renewable energy plants in Ninh Thuan, Khanh Hoa and Phu Yen Provinces.  According to the schedule, the new substation is to be energized in 2022.</p>
<p><em><img loading="lazy" decoding="async" class="alignnone size-full wp-image-8328" src="https://ats.com.vn/medias/medias/2022/01/toan_canh_tram_van_phong.jpg" alt="" width="2000" height="1125" />Construction Site of Van Phong 500k Substation Project</em></p>
<p>As a contractor with demonstrated experience and technical capability in meeting the demand of critical infrastructure project, ATS has recently been selected and awarded with the contract to supply the scope of the substation’s secondary system, covering from the design, supply, installation, to testing and commissioning of the final substation.  The system to be applied for the 500kV substation’s  control and protection is <a href="https://ats.com.vn/substation-automation/">@Station®</a> &#8211; ATS’s solution for substation automation that integrates all monitoring and control functions in a flexible system structure specifically tailor-made for each project.  The solution has been deployed sucessfully and in stable operation in hundreds of high and ultra-high substations and critical power infrastructures, in Vietnam and internationally.</p>
<p><img loading="lazy" decoding="async" class="alignnone size-full wp-image-8329" src="https://ats.com.vn/medias/medias/2022/01/He-thong-Dieu-khien-Bao-ve-Tram-bien-ap-cua-ATS-tai-phong-dieu-khien-tram-500kV-TTDL-Quang-Trach.jpg" alt="" width="2558" height="1440" /></p>
<p><em>Substation Automation System</em><em> @Station® in Operation</em></p>
<p>The post <a href="https://ats.com.vn/ats-awarded-with-contract-for-500kv-van-phong-substation-secondary-system/">ATS Awarded with Contract for 500kV Van Phong Substation Secondary System</a> appeared first on <a href="https://ats.com.vn">ATS JSC</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
